The Oak Tree Stained Glass Studio & Supply

 Established 1989 Home Site Map   
 

 

Free Patterns

The Oak Tree
In Delaware
302 984 2648

Brass Side Lights

Products | Windows | Doors | Transoms | Hangings | Catchers | Lamps |

Side Lights | Sidelight Kits | Side Light Designs | Side Light Design Form | Side Light Construction

Brass | Foil

Adding a touch elegant brass to match your entranceway hardware.

BRASS IS BEAUTIFULL

Crafted with care and the old world tradition. All glass is cut and soldered buy hand, to maintain a timeless tradition.
Continue: Side Light Designs

 

 

Installation: can be boiled down into 6 basic steps. Its not rocket science, and on standard a entranceway with a vinyl frame system the whole process shouldn't take more than 2 hours. Most lights have a caulk bead applied between the frame and the outer face or exterior of the entranceway.

  • Step #1, Try loosening the screws on the interior side first. Note: do not remove them completely at this time, as the old unit could fall and get damaged. We recommend that you save the old unit for a spare, incase of damage to the new unit. A putty knife or blade can be used to free the frame from the metal surface.
  • Once the caulk has been cut away or freed, a second person should be on the outside to hold the exterior of the old light frame while the first person removes the screws completely from inside the house.
  • After this step, gently coax the frame apart from the inside and or outside. The use of a putty knife or small pry bay may help. (Do not force your way to removing the old frame as this may cause it to crack).
  • Step #2, Once the opening is clear, a small amount of cleaning may be necessary, like scraping away any old caulk or debris.
  • Step #3, Next step: run a small bead of good weatherproof caulk (White or a Paintable type) if you prefer, to grove on the outer frame containing the safety glass and the art panel.
  • Step #4, Simply hold in place the new frame in from the exterior.
  • Step #5, A second party can mount the inside frame with screws provided, into the holes of the interior frame, and secure the frames with a snug fit.
  • Step #6, Clean up your tools and your finished.
1. Old light removal
2. Opening prep & calk
3. New light fitting
4. Secure & square up
5. Install inside frame
6. View finished work
Any homeowner that does not feel comfortable in the installation process as outlined above or anywhere on this website should seek the help of a professional carpenter or other type of experienced tradesman to aid in the installation process. We cannot guarantee the success of each and every install through the steps listed above and as such you urged to read all information and understand the process before you attempt to do a self installation. The Oak Tree Stained Glass Studio is not liable for any damages (personal or property) incurred while installing side lights purchased from us.

 

 

 

 

 

 

 

Copyright 2008 - The Oak Tree Stained Glass - All Rights Reserved

 
home ] shop online ] starterkits ] products ] students ] software ] patterns ] new work ] tool review ]